EV Charging
EV Charger Installation in Hallsville & East Texas
Level 2 EV charger installation on a 240 volt dedicated circuit. Load calculation first, circuit sized to 125 percent. Garage, carport, and outdoor installs. Call (903) 736-6952.
EV Charger Installation
Charging your EV at home means you start every day full. A Level 2 charger on a 240 volt dedicated circuit does that in a few hours instead of overnight on a regular outlet.
But your panel has to be able to carry it. We start with a load calculation to confirm your panel has the capacity for the charger. EV charging is treated as a continuous load, so we size the circuit to 125 percent of the charger's rating.
We install in garages, carports, and outdoor locations, and we work with most Level 2 chargers. We get the circuit right so the charger runs clean and your panel stays safe.
Signs you need this
- You bought an EV and want to charge at home
- You are charging on a regular outlet and it is too slow
- Your charger tripped a breaker because it shares a circuit
- You want a 240 volt Level 2 charger in the garage or carport
- You need an outdoor rated install near where you park
- Your panel is older and you are not sure it can carry the load
How Rieger Electric does the job
- 1
We do a load calculation
We check your panel and your loads to confirm it can carry the charger. If it is tight, we talk through a panel upgrade or a subpanel.
- 2
We plan the circuit
EV charging is a continuous load, so we size the circuit to 125 percent of the charger rating. We pick the right breaker and wire for the job.
- 3
We explain the price
You get the install plan and the price before we start, including any panel work that has to happen first.
- 4
We install and test
We run the dedicated circuit, mount the charger, and test it. We pull permits where the city requires them.
What affects the price
We explain the work and the price before we start. These are the things that change the scope, not a quote. Call us for your number.
- Whether your panel has capacity or needs an upgrade first
- How far the charger is from the panel, which sets the wire run
- Whether the install is indoor, carport, or outdoor rated
- The charger you choose and its amperage
- Whether a permit and inspection are required by your city
Safety and code notes
- EV charging is treated as a continuous load. The circuit must be sized to 125 percent of the charger's rating, or it can overheat the breaker and wire.
- A Level 2 charger needs its own dedicated 240 volt circuit. Sharing a circuit with other loads will trip the breaker.
- Outdoor installs need weatherproof equipment rated for the location.
Towns we serve
We serve East Texas within about 50 miles of Hallsville, TX.
Harrison County
Gregg County
Upshur County
Marion County
Panola County
Rusk County
Smith County
EV Charger Installation questions
Can my panel handle an EV charger?
We start with a load calculation to find out. If your panel is tight, we talk through a panel upgrade or a subpanel before we install.
Why does the circuit get sized to 125 percent?
EV charging is a continuous load, meaning it draws full current for hours. Code requires sizing the circuit to 125 percent of the charger rating so the breaker and wire do not overheat.
Can you install outdoors where I park?
Yes. We do garage, carport, and outdoor installs with weatherproof equipment rated for the location.
Does my charger work with your install?
We work with most Level 2 chargers. Tell us which one you have or are considering and we confirm the circuit matches it.
Do you pull permits for EV charger installs?
We pull permits where the city requires them and do the work to Texas code.
Call us, it's fastest
(903) 736-6952Tell us what's going on.
Calling is fastest. Prefer to type? We'll get back to you during business hours.